|| Gryphon's Home Page || N6RFM Home Page ||

|| End of Log||

  • flush Nissan 3.5 cooling system with fresh water
  • drain fuel from Nissan 3.5; drain carburetor bowl
  • fog Nissan 3.5
  • change LU oil in Nissan 3.5
  • clean and rinse Avon inflatable
  • check and if needed re-glue several small fabric edges on Avon
  • bring ladder to boatyard
  • remove all freezable liquids from boat
  • service all sea-cocks
  • bring canvas to Thurston's for inspection and repair

    • clean 135 headsail
    • wash all boat linens
    • order Spartan Marine seacock handles
    • repaint under port saloon cushion area
    • re-finish galley and cabin interior at knee level and below
    • rebuild Raritan PHII head
    • replace black water hose from head to Y-valve
    • replace anti-siphon in head
    • re-bed forward starboard portlight
    • refinish cabin sole
    • lubricate Y-valve

      October -

    November -

    December - April -

    || Gryphon's Home Page || N6RFM Home Page ||